One city, Marshfield, is in line for more than $11.1 million to build a single PFAS treatment plant. That is the scale of the projects on the list Wisconsin Governor Tony Evers and the state Department of Natural Resources (DNR) put out on November 16: more than $371 million in Safe Drinking Water Loan Program funding for 80 communities.
What's on the list
The program is how Wisconsin hands out its share of federal Drinking Water State Revolving Fund money, topped up by the state. This round is aimed at construction, with PFAS and manganese contamination called out and a stated focus on small and disadvantaged communities.
Three projects named in the announcement show the mix:
Marshfield (Wood County) has $11,199,760 allocated, of which $7,000,000 is principal forgiveness, for a new water treatment plant at its southside wellfield to remove PFAS.
Grantsburg (Burnett County) has $5,774,026, including $4,041,819 of forgiveness, for a new treatment facility to deal with manganese at Wells #1 and #2.
Hazel Green (Grant County) has $1,663,400, including $748,530 of forgiveness, to replace substandard water mains at several locations around the village.
Whatever isn't forgiven is lent at a subsidized interest rate.
How the money flows
This is the preliminary list for state fiscal year 2027. Municipalities get 30 days to ask the DNR to reevaluate their priority score, then the list is finalized. Awards are made over the following year and cash goes out as eligible costs are incurred, so this is spending that shows up across 2027 rather than in one hit.
Part of the total comes from federal capitalization grants: $6,579,000 of base DWSRF money, $42,616,000 of supplemental Bipartisan Infrastructure Law funding and $13,169,000 of BIL emerging contaminants (PFAS) money. The release notes that the BIL supplemental funding is coming to an end, and that the state's 2025-27 budget added $731.6 million of borrowing for the State Revolving Fund, which covers this program and the Clean Water Fund. Since 1998, the program has provided nearly $2 billion to Wisconsin municipalities. WaterWorld's write-up gives the same headline numbers.
The bigger picture
This is Wisconsin's second big drinking water list in a month. In October the state lined up $102 million to replace about 15,000 private lead service lines, which we covered in Vol 1.
The two lists pull in different directions for suppliers. Lead line work is fast, high-volume and heavy on service line materials and meter setters. Treatment plants like Marshfield's are slower and engineered, which means the specs get written well before anything is ordered. For treatment equipment reps in the upper Midwest, the time to be in front of the consulting engineers is now.
Main replacement projects like Hazel Green's sit in between: smaller tickets, but plenty of them, and they tend to go to the distributor with the best local relationship and stock.
What it means for hiring
- PFAS treatment plants are engineered sales. We expect demand for application engineers and regional sales managers who can work with consulting engineers on media selection and plant design, not just quote equipment.
- Distributors in Wisconsin and neighboring states may want inside sales and counter staff in place for a steady flow of small and mid-size municipal jobs through 2027.
- People who understand SRF paperwork and timing, on the utility side or the supplier side, are useful to have when awards are spread out and cash arrives as costs are incurred.
Building a team in Waterworks?
Alex Parsons specialises in Waterworks hiring at QP Group. Talk to Alex about the market, salaries or a search.
Sources
- Gov. Evers, Dept. of Natural Resources: Announce $371 million to improve drinking water quality for Wisconsinites in 80 municipalities · Office of the Governor via WisPolitics · 16 Nov 2026
- Wisconsin allocates $371M for drinking water infrastructure projects · WaterWorld · 19 Nov 2026
Written by QP Group from the reporting and announcements above. Figures and quotes belong to the original sources.

More from Waterworks Weekly
- California Water Service Group becomes Watermark Utilities as it grows past California22 Nov 2026
- Mueller's annual report shows two distributors took about a third of its sales22 Nov 2026
- Arkansas approves $261M for 75 water projects, and aeration keeps coming up22 Nov 2026
- Austin's $892M federal loan gets an AA, and Walnut Creek gets bigger22 Nov 2026

